CLC/TC 20
Project No. | EN 60811-407:2012 |
---|---|
Title | IEC 60811-407:2012 gives the procedure to examine possible interaction between insulation material and filling compound of filled cable. IEC 60811-407:2012 cancels and replaces Clause 11 of IEC 60811-4-2:2004, which is withdrawn. Full details of the replacements are shown in Annex A of IEC 60811-100:2012. There are no specific technical changes with respect to the previous edition, but see the Foreword to IEC 60811-100:2012. This publication is to be read in conjunction with <a href='http://webstore.iec.ch/webstore/webstore.nsf/ArtNum_PK/46164'>IEC 60811-100:2012</a>. |
Registration number (WIID) | 42513 |
Scope | IEC 60811-407:2012 gives the procedure to examine possible interaction between insulation material and filling compound of filled cable. IEC 60811-407:2012 cancels and replaces Clause 11 of IEC 60811-4-2:2004, which is withdrawn. Full details of the replacements are shown in Annex A of IEC 60811-100:2012. There are no specific technical changes with respect to the previous edition, but see the Foreword to IEC 60811-100:2012. This publication is to be read in conjunction with <a href='http://webstore.iec.ch/webstore/webstore.nsf/ArtNum_PK/46164'>IEC 60811-100:2012</a>. |
Status | Izstrādē |
ICS group | 29.035.01 29.060.20 |