CLC/TC 64
| Project No. | HD 384.6.61 S1:1992 |
|---|---|
| Title | Every installation shall, during erection and/or on completion before being put into service by the user, be visually inspected and tested to verify, as far as practicable, that the requirements of this standard have been met. |
| Registration number (WIID) | 51250 |
| Scope | Every installation shall, during erection and/or on completion before being put into service by the user, be visually inspected and tested to verify, as far as practicable, that the requirements of this standard have been met. |
| Status | Atcelts |
| ICS group | Not set |
