CLC/TC 9X
Project No. | CLC/TR 50451:2007 |
---|---|
Title | The scope of this Technical Report is to define a method to determine the required Safety Integrity Level of railway signalling equipment taking in consideration • the operational conditions of the railway, and • the architecture of the signalling system. From a mechanistic point of view the task of this Technical Report is to define a method of calculation, which determines the integrity requirements (qualitatively and quantitatively) from the inputs stated above. |
Registration number (WIID) | 48796 |
Scope | The scope of this Technical Report is to define a method to determine the required Safety Integrity Level of railway signalling equipment taking in consideration • the operational conditions of the railway, and • the architecture of the signalling system. From a mechanistic point of view the task of this Technical Report is to define a method of calculation, which determines the integrity requirements (qualitatively and quantitatively) from the inputs stated above. |
Status | Atcelts |
ICS group | 45.020 93.100 |