CLC/TC 65X
Project No. | EN 62439-3:2012 |
---|---|
Title | IEC 62439-3:2012 specifies two redundancy protocols designed to provide seamless recovery in case of single failure of an inter-bridge link or bridge in the network, which are based on the same scheme: duplication of the LAN, resp. duplication of the transmitted information. This second edition cancels and replaces the first edition published in 2010. It constitutes a technical revision. The main changes with respect to the previous edition are: - specification of the interconnection of PRP and HSR networks; - introduction of a suffix for PRP frames; - clarification and modification of specifications to ensure interoperability; - slackening of the specifications to allow different implementations; - consideration of clock synchronization according to IEC 61588; - introduction of test modes to simplify testing and maintenance. |
Registration number (WIID) | 43072 |
Scope | IEC 62439-3:2012 specifies two redundancy protocols designed to provide seamless recovery in case of single failure of an inter-bridge link or bridge in the network, which are based on the same scheme: duplication of the LAN, resp. duplication of the transmitted information. This second edition cancels and replaces the first edition published in 2010. It constitutes a technical revision. The main changes with respect to the previous edition are: - specification of the interconnection of PRP and HSR networks; - introduction of a suffix for PRP frames; - clarification and modification of specifications to ensure interoperability; - slackening of the specifications to allow different implementations; - consideration of clock synchronization according to IEC 61588; - introduction of test modes to simplify testing and maintenance. |
Status | Atcelts |
ICS group | 25.040 35.040 |