Project No.ISO 5124:2024
Title<p class="MsoBodyText"><span lang="EN-GB">This document provides requirements and recommendations for the design, construction and operation of newly installed liquefied natural gas (LNG) railway loading and unloading facilities for use on onshore LNG terminals, LNG satellite plants, handling LNG tank wagons or tank containers engaged in international trade.</span></p> <p class="MsoBodyText"><span lang="EN-GB">The designated boundary limits of this document are between the LNG terminal’s inlet/outlet piping headers at the beginning of the rail loading or unloading area and the rail track area used for LNG tank wagons and containers. It is applicable to all rail loading bays, weighbridge(s) and related subsystems.</span></p>
Registration number (WIID)81758
Scope<p class="MsoBodyText"><span lang="EN-GB">This document provides requirements and recommendations for the design, construction and operation of newly installed liquefied natural gas (LNG) railway loading and unloading facilities for use on onshore LNG terminals, LNG satellite plants, handling LNG tank wagons or tank containers engaged in international trade.</span></p> <p class="MsoBodyText"><span lang="EN-GB">The designated boundary limits of this document are between the LNG terminal’s inlet/outlet piping headers at the beginning of the rail loading or unloading area and the rail track area used for LNG tank wagons and containers. It is applicable to all rail loading bays, weighbridge(s) and related subsystems.</span></p>
StatusStandarts spēkā
ICS group75.200