Project No.CEN/TR 15589:2014
TitleThis Technical Report provides a methodology for approval of NDT personnel under the provisions of Directive 97/23/EC, Annex 1, section 3.1.3. The provisions of Guideline 6/13 are detailed herein to ensure a consistent approach and a high level of confidence in the approval of NDT personnel by RTPO’s through widespread adoption of the criteria and approval processes detailed herein. A flow diagram illustrating this methodology is presented in Annex A.
Registration number (WIID)39678
ScopeThis Technical Report provides a methodology for approval of NDT personnel under the provisions of Directive 97/23/EC, Annex 1, section 3.1.3. The provisions of Guideline 6/13 are detailed herein to ensure a consistent approach and a high level of confidence in the approval of NDT personnel by RTPO’s through widespread adoption of the criteria and approval processes detailed herein. A flow diagram illustrating this methodology is presented in Annex A.
StatusStandarts spēkā
ICS group19.100