This document describes procedures for factory production control, third party inspection, and certification for verifying the conformity of gully tops and manhole tops with a clear opening up to and including 1 000 mm for installation within areas subjected to pedestrian and/or vehicular traffic in accordance with prEN 124-7.
This document is only applicable in combination with prEN 124-7. The quality management system is expected to conform to or to be no less stringent than the relevant requirements of EN ISO 9001.
This document details the applicable characteristics to be assessed for type testing, batch release test, process verification test and audit test, as well as frequency and sampling for testing products according to prEN 124-7.
Registration number (WIID)
76252
Scope
This document describes procedures for factory production control, third party inspection, and certification for verifying the conformity of gully tops and manhole tops with a clear opening up to and including 1 000 mm for installation within areas subjected to pedestrian and/or vehicular traffic in accordance with prEN 124-7.
This document is only applicable in combination with prEN 124-7. The quality management system is expected to conform to or to be no less stringent than the relevant requirements of EN ISO 9001.
This document details the applicable characteristics to be assessed for type testing, batch release test, process verification test and audit test, as well as frequency and sampling for testing products according to prEN 124-7.