CEN/TC 219
Project No. | - |
---|---|
Title | To incorporate the different levels of maintenance checks and control i.e. functional checks and, preformance verification (efficacy of cathodic protection system) which can be replaced by remote control system data acquisition. |
Registration number (WIID) | 26923 |
Scope | To incorporate the different levels of maintenance checks and control i.e. functional checks and, preformance verification (efficacy of cathodic protection system) which can be replaced by remote control system data acquisition. |
Status | Izstrādē |
ICS group | Not set |