CEN/TC 227
Project No. | EN 12697-36:2003 |
---|---|
Title | Both methods can be used for the determination of the thickness of a bituminous paving construction. When compliance is to be established, the method to be used and -if relevant- the position of the cores in the slab should be agreed in advance by the relevant parties. |
Registration number (WIID) | 10804 |
Scope | Both methods can be used for the determination of the thickness of a bituminous paving construction. When compliance is to be established, the method to be used and -if relevant- the position of the cores in the slab should be agreed in advance by the relevant parties. |
Status | Atcelts |
ICS group | 93.080.20 |