Project No.CEN/TS 15173:2006
TitleThe scope is defined in 4.2 "Boundary of the PIMS". The structure in the scope of PIMS is on-shore pipelines and related equipment (insulating devices, disconnecting devices, pre-pressure reduction devices, cathodic protection equipment and simple interconnections). The delivery points, "complex" interconnections, storage facilities, terminals and compressor stations are not included in this scope.
Registration number (WIID)24235
ScopeThe scope is defined in 4.2 "Boundary of the PIMS". The structure in the scope of PIMS is on-shore pipelines and related equipment (insulating devices, disconnecting devices, pre-pressure reduction devices, cathodic protection equipment and simple interconnections). The delivery points, "complex" interconnections, storage facilities, terminals and compressor stations are not included in this scope.
StatusAtcelts
ICS group23.040.01
03.100.70
75.200