<p class="MsoBodyText"><span lang="EN-GB">This document specifies procedures for the calculation of the energy needs for heating and cooling, internal temperatures and sensible and latent heat loads of a building according to the hourly calculation methodology in ISO 52016-1. Additions or modifications of the calculations are provided in this document if the building envelope contains one or more adaptive building envelope elements (building envelope elements with adaptive components that are either environmentally or actively controlled as a function of specific conditions). The adaptive building envelope element replaces the transparent building element in the calculation according to ISO 52016-1.</span></p>
<p class="MsoBodyText"><span lang="EN-GB">The three types of adaptive building envelope elements covered in this document are:</span></p>
<p class="ListContinue1" style="mso-list: l0 level1 lfo1;"><!-- [if !supportLists]--><span lang="EN-GB" style="mso-fareast-font-family: Cambria; mso-bidi-font-family: Cambria;"><span style="mso-list: Ignore;">—<span style="font: 7.0pt 'Times New Roman';"> </span></span></span><!--[endif]--><span lang="EN-GB">building envelope elements with dynamic solar shading;</span></p>
<p class="ListContinue1" style="mso-list: l0 level1 lfo1;"><!-- [if !supportLists]--><span lang="EN-GB" style="mso-fareast-font-family: Cambria; mso-bidi-font-family: Cambria;"><span style="mso-list: Ignore;">—<span style="font: 7.0pt 'Times New Roman';"> </span></span></span><!--[endif]--><span lang="EN-GB">building envelope elements with chromogenic glazing;</span></p>
<p class="ListContinue1" style="mso-list: l0 level1 lfo1;"><!-- [if !supportLists]--><span lang="EN-GB" style="mso-fareast-font-family: Cambria; mso-bidi-font-family: Cambria;"><span style="mso-list: Ignore;">—<span style="font: 7.0pt 'Times New Roman';"> </span></span></span><!--[endif]--><span lang="EN-GB">building envelope elements with an actively ventilated cavity.</span></p>
<p class="MsoBodyText"><span lang="EN-GB">Environmentally activated control is described for building envelope elements with chromogenic glazing, but can also occur for other types of adaptive building envelope elements. In that case the same approach applies as for environmentally activated chromogenic glazing.</span></p>
<p class="MsoBodyText"><span lang="EN-GB">This document is applicable to the assessment of the energy performance of buildings (EPB) (energy performance labels and certificates), including comparison between buildings and checking conformity with minimum energy performance criteria.</span></p>
<p class="MsoBodyText"><span lang="EN-GB">It is also applicable to assess the contribution of the adaptive building envelope element to the smart readiness of a building.</span></p>
<p class="MsoBodyText"><span lang="EN-GB">In addition, this document provides indicators for the impact of the adaptive building envelope element on the performance of the building compared to a reference building envelope element. It is applicable to buildings at the design stage, to new buildings after construction and to existing buildings in the use phase.</span></p>
<p class="MsoBodyText"><span lang="EN-GB">This document is not applicable to geometrically complex adaptive building envelope elements that can only be modelled as multiple coupled thermal zones.</span></p>
<p class="Note"><span lang="EN-GB">NOTE<span style="mso-tab-count: 1;"> </span>The background to the selection of adaptive building envelope elements is given in ISO/TR 52016-4.</span></p>
Registration number (WIID)
75395
Scope
<p class="MsoBodyText"><span lang="EN-GB">This document specifies procedures for the calculation of the energy needs for heating and cooling, internal temperatures and sensible and latent heat loads of a building according to the hourly calculation methodology in ISO 52016-1. Additions or modifications of the calculations are provided in this document if the building envelope contains one or more adaptive building envelope elements (building envelope elements with adaptive components that are either environmentally or actively controlled as a function of specific conditions). The adaptive building envelope element replaces the transparent building element in the calculation according to ISO 52016-1.</span></p>
<p class="MsoBodyText"><span lang="EN-GB">The three types of adaptive building envelope elements covered in this document are:</span></p>
<p class="ListContinue1" style="mso-list: l0 level1 lfo1;"><!-- [if !supportLists]--><span lang="EN-GB" style="mso-fareast-font-family: Cambria; mso-bidi-font-family: Cambria;"><span style="mso-list: Ignore;">—<span style="font: 7.0pt 'Times New Roman';"> </span></span></span><!--[endif]--><span lang="EN-GB">building envelope elements with dynamic solar shading;</span></p>
<p class="ListContinue1" style="mso-list: l0 level1 lfo1;"><!-- [if !supportLists]--><span lang="EN-GB" style="mso-fareast-font-family: Cambria; mso-bidi-font-family: Cambria;"><span style="mso-list: Ignore;">—<span style="font: 7.0pt 'Times New Roman';"> </span></span></span><!--[endif]--><span lang="EN-GB">building envelope elements with chromogenic glazing;</span></p>
<p class="ListContinue1" style="mso-list: l0 level1 lfo1;"><!-- [if !supportLists]--><span lang="EN-GB" style="mso-fareast-font-family: Cambria; mso-bidi-font-family: Cambria;"><span style="mso-list: Ignore;">—<span style="font: 7.0pt 'Times New Roman';"> </span></span></span><!--[endif]--><span lang="EN-GB">building envelope elements with an actively ventilated cavity.</span></p>
<p class="MsoBodyText"><span lang="EN-GB">Environmentally activated control is described for building envelope elements with chromogenic glazing, but can also occur for other types of adaptive building envelope elements. In that case the same approach applies as for environmentally activated chromogenic glazing.</span></p>
<p class="MsoBodyText"><span lang="EN-GB">This document is applicable to the assessment of the energy performance of buildings (EPB) (energy performance labels and certificates), including comparison between buildings and checking conformity with minimum energy performance criteria.</span></p>
<p class="MsoBodyText"><span lang="EN-GB">It is also applicable to assess the contribution of the adaptive building envelope element to the smart readiness of a building.</span></p>
<p class="MsoBodyText"><span lang="EN-GB">In addition, this document provides indicators for the impact of the adaptive building envelope element on the performance of the building compared to a reference building envelope element. It is applicable to buildings at the design stage, to new buildings after construction and to existing buildings in the use phase.</span></p>
<p class="MsoBodyText"><span lang="EN-GB">This document is not applicable to geometrically complex adaptive building envelope elements that can only be modelled as multiple coupled thermal zones.</span></p>
<p class="Note"><span lang="EN-GB">NOTE<span style="mso-tab-count: 1;"> </span>The background to the selection of adaptive building envelope elements is given in ISO/TR 52016-4.</span></p>