ISO/TC 205
Project No. | ISO 16484-1:2010 |
---|---|
Title | <p>ISO 16484-1:2010 specifies guiding principles for project design and implementation and for the integration of other systems into the building automation and control systems (BACS). </p> <p>ISO 16484-1:2010 specifies the phases required for the BACS project, including:</p> <ul> <li>design (determination of project requirements and production of design documents including technical specifications), </li> <li>engineering (detailed function and hardware design),</li> <li>installation (installing and commissioning of the BACS), and</li> <li>completion (handover, acceptance and project finalization).</li> </ul> <p>ISO 16484-1:2010 also specifies the requirements for as-built documentation and training.</p> <p>ISO 16484-1:2010 is not applicable to operation and maintenance, nor is it applicable to retro or continuous commissioning, including a commissioning authority.</p> |
Registration number (WIID) | 37300 |
Scope | <p>ISO 16484-1:2010 specifies guiding principles for project design and implementation and for the integration of other systems into the building automation and control systems (BACS). </p> <p>ISO 16484-1:2010 specifies the phases required for the BACS project, including:</p> <ul> <li>design (determination of project requirements and production of design documents including technical specifications), </li> <li>engineering (detailed function and hardware design),</li> <li>installation (installing and commissioning of the BACS), and</li> <li>completion (handover, acceptance and project finalization).</li> </ul> <p>ISO 16484-1:2010 also specifies the requirements for as-built documentation and training.</p> <p>ISO 16484-1:2010 is not applicable to operation and maintenance, nor is it applicable to retro or continuous commissioning, including a commissioning authority.</p> |
Status | Atcelts |
ICS group | 91.040.01 35.240.67 |