Project No.ISO 16484-1:2024
Title<p class="MsoBodyText"><span lang="EN-GB">This document specifies guiding principles for project design and implementation and for the integration of other systems into the building automation and control systems (BACS).</span></p> <p class="MsoBodyText"><span lang="EN-GB">This document specifies the phases required for the BACS project, including</span></p> <p class="ListContinue1" style="mso-list: l0 level1 lfo1;"><!-- [if !supportLists]--><span lang="EN-GB" style="mso-fareast-font-family: Cambria; mso-bidi-font-family: Cambria;"><span style="mso-list: Ignore;">—<span style="font: 7.0pt 'Times New Roman';">     </span></span></span><!--[endif]--><span lang="EN-GB">design (determination of project requirements and production of design documents including technical specifications),</span></p> <p class="ListContinue1" style="mso-list: l0 level1 lfo1;"><!-- [if !supportLists]--><span lang="EN-GB" style="mso-fareast-font-family: Cambria; mso-bidi-font-family: Cambria;"><span style="mso-list: Ignore;">—<span style="font: 7.0pt 'Times New Roman';">     </span></span></span><!--[endif]--><span lang="EN-GB">engineering (detailed function and hardware design),</span></p> <p class="ListContinue1" style="mso-list: l0 level1 lfo1;"><!-- [if !supportLists]--><span lang="EN-GB" style="mso-fareast-font-family: Cambria; mso-bidi-font-family: Cambria;"><span style="mso-list: Ignore;">—<span style="font: 7.0pt 'Times New Roman';">     </span></span></span><!--[endif]--><span lang="EN-GB">installation (installing and commissioning of the BACS), and</span></p> <p class="ListContinue1" style="mso-list: l0 level1 lfo1;"><!-- [if !supportLists]--><span lang="EN-GB" style="mso-fareast-font-family: Cambria; mso-bidi-font-family: Cambria;"><span style="mso-list: Ignore;">—<span style="font: 7.0pt 'Times New Roman';">     </span></span></span><!--[endif]--><span lang="EN-GB">completion (handover, acceptance and project finalization).</span></p> <p class="MsoBodyText"><span lang="EN-GB">This document also specifies the requirements for as-built documentation and training.</span></p> <p class="MsoBodyText"><span lang="EN-GB">This document is not applicable to operation and maintenance, nor is it applicable to retro or continuous commissioning, including a commissioning authority.</span></p>
Registration number (WIID)84890
Scope<p class="MsoBodyText"><span lang="EN-GB">This document specifies guiding principles for project design and implementation and for the integration of other systems into the building automation and control systems (BACS).</span></p> <p class="MsoBodyText"><span lang="EN-GB">This document specifies the phases required for the BACS project, including</span></p> <p class="ListContinue1" style="mso-list: l0 level1 lfo1;"><!-- [if !supportLists]--><span lang="EN-GB" style="mso-fareast-font-family: Cambria; mso-bidi-font-family: Cambria;"><span style="mso-list: Ignore;">—<span style="font: 7.0pt 'Times New Roman';">     </span></span></span><!--[endif]--><span lang="EN-GB">design (determination of project requirements and production of design documents including technical specifications),</span></p> <p class="ListContinue1" style="mso-list: l0 level1 lfo1;"><!-- [if !supportLists]--><span lang="EN-GB" style="mso-fareast-font-family: Cambria; mso-bidi-font-family: Cambria;"><span style="mso-list: Ignore;">—<span style="font: 7.0pt 'Times New Roman';">     </span></span></span><!--[endif]--><span lang="EN-GB">engineering (detailed function and hardware design),</span></p> <p class="ListContinue1" style="mso-list: l0 level1 lfo1;"><!-- [if !supportLists]--><span lang="EN-GB" style="mso-fareast-font-family: Cambria; mso-bidi-font-family: Cambria;"><span style="mso-list: Ignore;">—<span style="font: 7.0pt 'Times New Roman';">     </span></span></span><!--[endif]--><span lang="EN-GB">installation (installing and commissioning of the BACS), and</span></p> <p class="ListContinue1" style="mso-list: l0 level1 lfo1;"><!-- [if !supportLists]--><span lang="EN-GB" style="mso-fareast-font-family: Cambria; mso-bidi-font-family: Cambria;"><span style="mso-list: Ignore;">—<span style="font: 7.0pt 'Times New Roman';">     </span></span></span><!--[endif]--><span lang="EN-GB">completion (handover, acceptance and project finalization).</span></p> <p class="MsoBodyText"><span lang="EN-GB">This document also specifies the requirements for as-built documentation and training.</span></p> <p class="MsoBodyText"><span lang="EN-GB">This document is not applicable to operation and maintenance, nor is it applicable to retro or continuous commissioning, including a commissioning authority.</span></p>
StatusStandarts spēkā
ICS group91.040.01
35.240.67