CLC/TC 82
| Registration number (WIID) | Project No. | Title | Status |
|---|---|---|---|
| 75077 | prEN IEC 62688:2025 | Concentrator photovoltaic (CPV) modules and assemblies - Safety qualification | Aptauja slēgta |
| 81955 | EN 62817:2015/prA2:2025 | Amendment 2 - Photovoltaic systems - Design qualification of solar trackers | Aptauja slēgta |
| 74662 | prEN IEC 63409-1:2026 | Photovoltaic power generating systems connection with the grid - Testing of power conversion equipment - Part 1: General requirements | Aptauja slēgta |
| 75250 | prEN IEC 62920:2025 | Photovoltaic power generating systems - EMC requirements and test methods for power conversion equipment | Aptauja slēgta |
| 76382 | prEN IEC 63409-5:2026 | Photovoltaic power generating systems connection with the grid - Testing for power conversion equipment - Part 5: Electromagnetic compatibility for low frequency conducted disturbances | Aptauja slēgta |
| 78458 | prEN IEC 63409-7:2026 | Photovoltaic power generating systems connection with the grid - Testing of power conversion equipment - Part 7: Remote configuration, control and monitoring | Aptauja |
| 75878 | prEN IEC 61853-3:2026 | Photovoltaic (PV) module performance testing and energy rating - Part 3: Energy rating of PV modules | Aptauja |
| 74664 | prEN IEC 63409-6:2026 | Photovoltaic power generating systems connection with the grid - Testing of power conversion equipment - Part 6: Power control functions and grid support | Aptauja |
| 57758 | LVS EN 61173:2002 | Overvoltage protection for photovoltaic (PV) power generating systems - Guide | Atcelts |
| 52446 | LVS EN 60904-9:2008 | Photovoltaic devices - Part 9: Solar simulator performance requirements | Atcelts |
Displaying 131-140 of 448 results.
