CLC/TC 82
| Registration number (WIID) | Project No. | Title | Status |
|---|---|---|---|
| 74664 | prEN IEC 63409-6:2026 | Photovoltaic power generating systems connection with the grid - Testing of power conversion equipment - Part 6: Power control functions and grid support | Aptauja |
| 75878 | prEN IEC 61853-3:2026 | Photovoltaic (PV) module performance testing and energy rating - Part 3: Energy rating of PV modules | Aptauja |
| 78458 | prEN IEC 63409-7:2026 | Photovoltaic power generating systems connection with the grid - Testing of power conversion equipment - Part 7: Remote configuration, control and monitoring | Aptauja |
| 81955 | EN 62817:2015/prA2:2025 | Amendment 2 - Photovoltaic systems - Design qualification of solar trackers | Aptauja slēgta |
| 74662 | prEN IEC 63409-1:2026 | Photovoltaic power generating systems connection with the grid - Testing of power conversion equipment - Part 1: General requirements | Aptauja slēgta |
| 74253 | EN 62920:2017/prAB | Photovoltaic power generating systems - EMC requirements and test methods for power conversion equipment | Aptauja slēgta |
| 74287 | prEN 50583-1:2026 | Photovoltaics in buildings - Part 1: BIPV modules | Aptauja slēgta |
| 81774 | prEN IEC 62446-1:2025 | Photovoltaic (PV) systems - Requirements for testing, documentation and maintenance - Part 1: Grid connected systems - Documentation, commissioning tests and inspection | Aptauja slēgta |
| 77945 | prEN IEC 62941:2024 | Terrestrial photovoltaic (PV) modules - Quality system for PV module manufacturing | Aptauja slēgta |
| 74779 | prEN IEC 62109-2:2025 | Safety of power converters for use in photovoltaic power systems - Part 2: Particular requirements for inverters | Aptauja slēgta |
Displaying 311-320 of 448 results.
