CLC/TC 205
| Registration number (WIID) | Project No. | Title | Status |
|---|---|---|---|
| 51293 | EN 50491-5-3:2010 | General requirements for Home and Building Electronic Systems (HBES) and Building Automation and Control Systems (BACS) - Part 5-3: EMC requirements for HBES/BACS used in industry environment | Izstrādē |
| 69013 | EN 50491-12-2:2022 | General requirements for Home and Building Electronic Systems (HBES) and Building Automation and Control Systems (BACS) - Part 12-2: Smart grid - Application specification - Interface and framework for customer - Interface between the Home / Building CEM and Resource manager(s) - Data model and messaging | Izstrādē |
| 81204 | prEN IEC 63402-2-1 | Energy efficiency - Customer energy management systems - Part 2-1: Data model and messaging - Interface between the distribution system operator/ energy management gateway and customer energy manager/ building energy manager (Proposed horizontal publication) | Izstrādē |
| 55668 | EN 50090-1:2011 | Home and Building Electronic Systems (HBES) - Part 1: Standardization structure | Izstrādē |
| 61574 | EN 50491-1:2014/FprAA:2017 | General requirements for Home and Building Electronic Systems (HBES) and Building Automation and Control Systems (BACS) - Part 1: General requirements | Izstrādē |
| 46781 | EN 50491-5-2:2010 | General requirements for Home and Building Electronic Systems (HBES) and Building Automation and Control Systems (BACS) - Part 5-2: EMC requirements for HBES/BACS used in residential, commercial and light industry environment | Izstrādē |
| 44454 | EN 50065-1:1991/prAB | Signalling on low-voltage electrical installations in the frequency range 3 kHz to 148,5 kHz - Part 1: General requirements, frequency bands and electromagnetic disturbances | Izstrādē |
| 43780 | CLC/prTS 59013 | Powerline Telecommunications (PLT) - Coexistence of Access/In-house Systems - PLT Phase 1 | Izstrādē |
| 45052 | prEN 50XXX | Safety | Izstrādē |
| 62340 | EN IEC 63044-5-3:2019 | Home and Building Electronic Systems (HBES) and Building Automation and Control Systems (BACS) - Part 5-3: EMC requirements for HBES/BACS used in industrial environments | Izstrādē |
Displaying 61-70 of 236 results.
