CLC/TC 13
Registration number (WIID) | Project No. | Title | Status |
---|---|---|---|
47577 | LVS EN 62059-31-1:2009 | Electricity metering equipment - Dependability - Part 31-1: Accelerated reliability testing - Elevated temperature and humidity (IEC 62059-31-1:2008) | Standarts spēkā |
42646 | LVS EN 62056-9-7:2014 | Electricity metering data exchange - The DLMS/COSEM suite - Part 9-7: Communication profile for TCP-UDP/IP networks (IEC 62056-9-7:2013) | Standarts spēkā |
42008 | LVS EN 62052-21:2005 | Electricity metering equipment (a.c.) - General requirements, test and test conditions - Part 21: Tariff and load control equipment | Standarts spēkā |
63672 | LVS EN IEC 62052-11:2021 | Electricity metering equipment - General requirements, tests and test conditions - Part 11: Metering equipment | Standarts spēkā |
79221 | LVS EN IEC 62052-11:2021/A12:2024 | Electricity metering equipment - General requirements, tests and test conditions - Part 11: Metering equipment | Standarts spēkā |
65936 | LVS CLC/TS 50586:2020 | Open Smart Grid Protocol (OSGP) | Standarts spēkā |
79497 | prEN IEC 62059-32-1:2025 | Electricity metering equipment - Dependability - Part 32-1: Durability - Testing of the stability of metrological characteristics by applying elevated temperature | Aptauja slēgta |
75819 | prEN IEC 62056-8-11:2025 | Electricity metering data exchange - The DLMS/COSEM suite - Part 8-11: Communication profile for Wi-SUN field area mesh networks | Aptauja slēgta |
42531 | LVS EN 61037:1992/corrigendum Dec. 1997 | Electricity metering - Tariff and load control - Particular requirements for electronic ripple control receivers | Atcelts |
58146 | LVS EN 61038:1992/corrigendum Dec. 1997 | Electricity metering - Tariff and load controls - Particular requirements for time switches | Atcelts |
Displaying 101-110 of 345 results.