CLC/TC 69X
Registration number (WIID) | Project No. | Title | Status |
---|---|---|---|
58170 | LVS ENV 50275-2-2:1998 | Conductive charging of electric vehicles - Part 2-2: A.C. charging station | Atcelts |
54206 | LVS ENV 50275-2-1:1998 | Conductive charging for electric vehicles - Part 2-1: Connection of an electric vehicle to an a.c./d.c. supply | Atcelts |
48602 | LVS ENV 50275-1:1998 | Conductive charging for electric vehicles - Part 1: General considerations | Atcelts |
80595 | LVS EN IEC 63584:2025 | Open Charge Point Protocol (OCPP) | Standarts spēkā |
76174 | LVS EN IEC 63380-1:2025 | Standard interface for connecting charging stations to local energy management systems - Part 1: General requirements, use cases and abstract messages | |
72566 | LVS EN IEC 63119-2:2023 | Information exchange for electric vehicle charging roaming service - Part 2: Use cases | Standarts spēkā |
66405 | LVS EN IEC 63119-1:2019 | Information exchange for electric vehicle charging roaming service - Part 1: General | Standarts spēkā |
67796 | LVS EN IEC 63110-1:2022 | Protocol for management of electric vehicles charging and discharging infrastructures - Part 1: Basic definitions, use cases and architectures | Standarts spēkā |
60597 | LVS EN IEC 62840-2:2019 | Electric vehicle battery swap system - Part 2: Safety requirements | Standarts spēkā |
71464 | LVS EN IEC 62840-1:2025 | Electric vehicle battery swap system - Part 1: General and guidance |
Displaying 41-50 of 133 results.