CLC/TC 8X
| Registration number (WIID) | Project No. | Title | Status |
|---|---|---|---|
| 63320 | prEN 50549-1-2 | Requirements for generating plants to be connected in parallel with distribution networks - Part 1-2: Connection to a LV distribution network - Generating plants of Type B | Izstrādē |
| 64322 | prEN 62559-1:2017 | Use Case Methodology - Part 1: Concept and Processes in Standardization | Izstrādē |
| 62067 | EN IEC 62559-3:2018 | Use case methodology - Part 3: Definition of use case template artefacts into an XML serialized format | Izstrādē |
| 52422 | prEN 50XXX | Utility interactive fail safe protective interface - Design qualification and type approval | Izstrādē |
| 46149 | prEN 50XXX | Rated voltages of DC-motors directly fed by controlled static power convertors from AC-power systems | Izstrādē |
| 82845 | CLC/prTS 50773-2 | Requirements for generating plants to be connected in parallel with public electrical grid - Part 2: Type D Generating plants | Izstrādē |
| 82842 | CLC/prTS 50773-10 | Requirements for generating plants to be connected in parallel with public electrical grid - Part 10: Tests for conformity assessment of Type C and D generating units | Izstrādē |
| 82843 | CLC/prTS 50XXX-1 | Requirements for dispatchable loads to be connected in parallel with public electrical grid - Part 1: Self-Regulation of Dispatchable Loads | Izstrādē |
| 54496 | EN 62559-2:2015 | Use case methodology - Part 2: Definition of the template for use cases, actor list and requirements list | Izstrādē |
| 77890 | CLC/prTS 50744-1 | Electrical characteristics of grid-forming generating and storage units to be connected in parallel with electrical networks - definitions and tests | Izstrādē |
Displaying 111-120 of 133 results.
