CLC/TC 8X
| Registration number (WIID) | Project No. | Title | Status |
|---|---|---|---|
| 63319 | EN 50549-1:2019 | Requirements for generating plants to be connected in parallel with distribution networks - Part 1: Connection to a LV distribution network - Generating plants up to and including Type B | Izstrādē |
| 44570 | CLC/TR 50555:2010/AC:2011 | Interruption indexes | Izstrādē |
| 80729 | prEN 50763 | Assessment of electrical flexibility services from power network perspective | Izstrādē |
| 70356 | prEN IEC 63189-1 | Virtual power plants - Part 1: Architecture and functional requirements | Izstrādē |
| 44357 | prEN 50XXX | Transient overvoltages and flicker | Izstrādē |
| 55168 | CLC/prTS 50XXX | Tests demonstrating compliance to requirements for the connection of generating plants in parallel with a LV or a MV distribution network | Izstrādē |
| 69184 | EN 50549-2:2019/AC:2019-03 | Requirements for generating plants to be connected in parallel with distribution networks - Part 2: Connection to a MV distribution network - Generating plants up to and including Type B | Izstrādē |
| 49211 | HD 472 S1:1989/prA1 | Nominal voltages for low-voltage public electricity supply systems | Izstrādē |
| 53941 | prEN 60242 | Standard frequencies for centralized network control installations | Izstrādē |
| 42410 | HD 472 S1:1989/prA2 | Nominal voltages for low-voltage public electricity supply systems | Izstrādē |
Displaying 121-130 of 133 results.