Registration number (WIID)Project No.TitleStatus
73168prEN 50562-2:2025Fixed installations for railway applications - Safety of electric traction power supply systems - Part 2: Generic approach for non-conventional applications, functions and propertiesAptauja slēgta
82458prEN 50617-1Railway applications - Technical parameters of train detection systems for the interoperability of the trans-European railway system - Part 1: Track circuitsIzstrādē
78575prEN 50641-1:2025Fixed Installations for Railway Applications - Requirements for the validation of simulation tools used for the design of electric traction power supply systems - Part 1: GeneralAptauja
42345prEN 50641:2014Railway applications - Fixed installations - Requirements for the validation of simulation tools used for the design of traction power supply systemsIzstrādē
82357prEN 50729Railway applications - Fixed installations and rolling stock - Interface requirements between charging infrastructure with dedicated contact line sections and electric traction units with onboard electric traction energy storages and current collectorsIzstrādē
79346prEN 50746Railway applications – Rolling stock - Electrotechnical requirements and test methods for DAC (DAC - Digital automatic coupler for freight)Izstrādē
79347prEN 50747Railway applications – Rolling stock - Requirements and test methods for electrotechnical equipment for digital freight train operationIzstrādē
57669prEN 50XXXRevision of DIN 43 589 part 1 - Connector for battery powered industrial trucks 80, 160, 320 Amps, 150 volts - Connecting dimensionsIzstrādē
50735prEN 50XXXRailways applications - ETCS driver machine interfaceIzstrādē
45951prEN 50XXXOverhead contact lines geometry - Requirements for interoperabilityIzstrādē
Displaying 991-1000 of 1107 results.