CLC/TC 9X
Registration number (WIID) | Project No. | Title | Status |
---|---|---|---|
56999 | prHD XXX S1 | Construction safety of traction systems | Izstrādē |
51835 | EN 50317:2012 | Railway applications - Current collection systems - Requirements for and validation of measurements of the dynamic interaction between pantograph and overhead contact line | Izstrādē |
45949 | prHD XXX S1 | Material for overhead contact lines for railways, underground and tramways at rated voltage up to 3 kV - Part 2: Clamps of insulating material for tube supports having a diameter of 76.60 and 50 mm | Izstrādē |
45993 | prEN 50388:2008/prA | Railway applications - Power supply and rolling stock - Technical criteria for the coordination between power supply (substation) and rolling stock to achieve interoperability | Izstrādē |
52521 | EN 62290-1:2014 | Railway applications - Urban guided transport management and command/control systems - Part 1: System principles and fundamental concepts | Izstrādē |
60927 | EN 50463-2:2017 | Railway applications - Energy measurement on board trains - Part 2: Energy measuring | Izstrādē |
54043 | EN 50163:2004/AC:2013 | Railway applications - Supply voltages of traction systems | Izstrādē |
80852 | EN 50716:2023/prA1 | Railway Applications - Requirements for software development | Izstrādē |
80194 | prEN IEC 61375-2-3 | Electronic railway equipment - Train communication network (TCN) - Part 2-3: TCN communication profile | Izstrādē |
57679 | EN 50328:2003 | Railway applications - Fixed installations - Electronic power converters for substations | Izstrādē |
Displaying 1021-1030 of 1088 results.