CLC/TC 9X
| Registration number (WIID) | Project No. | Title | Status |
|---|---|---|---|
| 79442 | CLC/TS 50712:2024 | Railway applications - Current collection systems - Technical criteria for the interaction between pantograph and overhead contact lines on electrified roads | Standarts spēkā |
| 77059 | CLC/TS 50711:2026 | Railway applications - Fixed installations - High-voltage/low-voltage prefabricated substations in AC and DC electric traction systems | Izstrādē |
| 74651 | CLC/TS 50701:2023 | Railway applications - Cybersecurity | Standarts spēkā |
| 67491 | CLC/TS 50701:2021 | Railway applications - Cybersecurity | Atcelts |
| 76620 | CLC/TS 50641-2:2024 | Fixed Installations for Railway Applications - Requirements for the validation of simulation tools used for the design of electric traction power supply systems - Part 2: specific DC urban case | Standarts spēkā |
| 50397 | CLC/TS 50591:2013 | Specification and verification of energy consumption for railway rolling stock | Atcelts |
| 49945 | CLC/TS 50562:2011 | Railway applications - Fixed installations - Process, measures and demonstration of safety for electric traction systems | Atcelts |
| 47201 | CLC/TS 50546:2013 | Railway applications - Rolling stock - 3-phase shore (external) supply system for rail vehicles | Atcelts |
| 57506 | CLC/TS 50537-4:2010 | Railway applications - Mounted parts of the traction transformer and cooling system - Part 4: Gas and liquid actuated (Buchholz) relay for liquid immersed transformers and reactors with conservator for rail vehicles | Izstrādē |
| 50070 | CLC/TS 50537-3:2010 | Railway applications - Mounted parts of the traction transformer and cooling system - Part 3: Water pump for traction converters | Izstrādē |
Displaying 1041-1050 of 1126 results.
