CLC/TC 9X
| Registration number (WIID) | Project No. | Title | Status |
|---|---|---|---|
| 61981 | LVS EN 50121-2:2017 | Railway applications - Electromagnetic compatibility - Part 2: Emission of the whole railway system to the outside world | Standarts spēkā |
| 53455 | LVS EN 50125-3:2003 | Railway applications - Environmental conditions for equipment - Part 3: Equipment for signalling and telecommunications | Standarts spēkā |
| 51184 | LVS EN 61375-3-2:2012 | Electronic railway equipment - Train communication network (TCN) - Part 3-2: MVB (Multifunction Vehicle Bus) conformance testing (IEC 61375-3-2:2012) | Standarts spēkā |
| 44231 | LVS EN 50123-4:2003 /A1:2014 | Railway applications - Fixed installations - D.C. switchgear - Part 4: Outdoor d.c. disconnectors, switch-disconnectors and earthing switches | Standarts spēkā |
| 49389 | LVS EN 50123-7-1:2003 | Railway applications - Fixed installations - D.C. switchgear - Part 7-1: Measurement, control and protection devices for specific use in d.c. traction systems - Application guide | Standarts spēkā |
| 46797 | LVS EN 50123-7-3:2003 | Railway applications - Fixed installations - D.C. switchgear - Part 7-3: Measurement, control and protection devices for specific use in d.c. traction systems; Isolating voltage transducers and other voltage measuring devices | Standarts spēkā |
| 74649 | LVS EN 50546:2024 | Railway applications - Rolling Stock - Three-phase shore (external) supply system for rail vehicles and its connectors | Standarts spēkā |
| 57297 | EN 50123-3:2003/A1:2013 | Railway applications - Fixed installations - D.C. switchgear - Part 3: Indoor d.c. disconnectors, switch-disconnectors and earthing switches | Standarts spēkā |
| 47487 | LVS EN 50152-1:2013 /A1:2014 | Railway applications - Fixed installations - Particular requirements for alternating current switchgear - Part 1: Circuit-breakers with nominal voltage above 1 kV | Standarts spēkā |
| 64727 | LVS EN 50367:2020 | Railway applications - Fixed installations and rolling stock - Criteria to achieve technical compatibility between pantographs and overhead contact line | Standarts spēkā |
Displaying 231-240 of 1120 results.
