Registration number (WIID)Project No.TitleStatus
75961CLC/TS 50729:2025Railway applications - Fixed installations and rolling stock - Interface requirements between charging infrastructure with dedicated contact line sections and electric traction units with onboard electric traction energy storages and current collectorsIzstrādē
77070prEN IEC 63477Railway applications - Coordination requirements and energy-saving performance evaluation for energy feedback systems in DC traction power systemsIzstrādē
74384FprEN IEC 63341-2:2025Railway applications - Hydrogen and fuel cell systems for rolling stock - Part 2: Hydrogen fuel systemIzstrādē
42086EN 50123-4:2003Railway applications - Fixed installations - D.C. switchgear - Part 4: Outdoor d.c. disconnectors, switch-disconnectors and earthing switchesIzstrādē
45214CLC/TS 50537-2:2010Railway applications - Mounted parts of the traction transformer and cooling system - Part 2: Pump for insulating liquid for traction transformers and reactorsIzstrādē
71559CLC/TS 50238-3:2022Railway applications - Compatibility between rolling stock and train detection systems - Part 3: Compatibility with axle countersIzstrādē
81040prEN 50463-2Railway applications - Energy measurement on board trains - Part 2: Energy measuringIzstrādē
41951prEN 50XXXRailway applications - Power supply and rolling stock - Technical criteria for the coordination between power supply and rolling stock to achieve interoperability - Part 2: Special requirements for rolling stockIzstrādē
63922EN 61375-3-4:2014/A11:2017Electronic railway equipment - Train communication network (TCN) - Part 3-4: Ethernet Consist Network (ECN)Izstrādē
60237EN 50126-2:2017Railway Applications - The Specification and Demonstration of Reliability, Availability, Maintainability and Safety (RAMS) - Part 2: Systems Approach to SafetyIzstrādē
Displaying 241-250 of 1088 results.