CLC/TC 9X
| Registration number (WIID) | Project No. | Title | Status |
|---|---|---|---|
| 81173 | prEN IEC 62973-1:2025 | Railway applications - Rolling stock - Batteries for auxiliary power supply systems - Part 1: General Requirements | Aptauja |
| 81038 | prEN 50463-3:2025 | Railway applications - Energy measurement on board trains - Part 3: Data handling | Aptauja |
| 81039 | prEN 50463-1:2025 | Railway applications - Energy measurement on board trains - Part 1: General | Aptauja |
| 81986 | prEN IEC 62973-4:2025 | Railway applications – Rolling stock – Batteries for auxiliary power supply systems – Part 4: Secondary sealed nickel-metal hydride batteries | Aptauja |
| 81192 | FprEN IEC 63341-2:2025/prAA:2025 | Railway applications - Hydrogen and fuel cell systems for rolling stock - Part 2: Hydrogen fuel system | Aptauja |
| 81987 | prEN IEC 62973-5:2025 | Railway applications - Rolling stock - Batteries for auxiliary power supply systems - Part 5: Lithium-ion batteries | Aptauja |
| 50847 | EN 50121-1:2006 | Railway applications - Electromagnetic compatibility - Part 1: General | Atcelts |
| 42144 | EN 61881:1999 | Railway applications - Rolling stock equipment - Capacitors for power electronics | Atcelts |
| 49380 | EN 50311:2003 | Railway applications - Rolling stock - D.C. supplied electronic ballasts for lighting fluorescent lamps | Atcelts |
| 57833 | LVS EN 50152-1:2008 | Railway applications - Fixed installations - Particular requirements for AC switchgear - Part 1: Single-phase circuit-breakers with U<(Index)n> above 1 Kv | Atcelts |
Displaying 331-340 of 1107 results.
