CLC/TC 9X
| Registration number (WIID) | Project No. | Title | Status |
|---|---|---|---|
| 82356 | prEN 50388-1:2026 | Fixed installations and rolling stock for railway applications - Technical criteria for the coordination between electric traction power supply systems and rolling stock to achieve interoperability - Part 1: General | Aptauja slēgta |
| 80852 | EN 50716:2023/prA1:2026 | Railway Applications - Requirements for software development | Aptauja slēgta |
| 81175 | prEN IEC 62973-3:2025 | Railway applications - Rolling stock - Batteries for auxiliary power supply systems - Part 3: Lead acid batteries | Aptauja slēgta |
| 73167 | prEN 50562-1:2025 | Fixed installations for railway applications - Safety of electric traction power supply systems - Part 1: Generic approach for conventional applications, functions and properties | Aptauja slēgta |
| 79345 | prEN 50206-2:2025 | Railway applications - Rolling stock - Pantographs: Characteristics and tests - Part 2: Pantographs for metros and light rail vehicles | Aptauja slēgta |
| 81039 | prEN 50463-1:2025 | Railway applications - Energy measurement on board trains - Part 1: General | Aptauja slēgta |
| 78575 | prEN 50641-1:2025 | Fixed Installations for Railway Applications - Requirements for the validation of simulation tools used for the design of electric traction power supply systems - Part 1: General | Aptauja slēgta |
| 76372 | prEN IEC 62590-3-2:2025 | Railway applications - Electronic power converters for fixed installations - Part 3-2: AC traction applications - Static frequency converter | Aptauja slēgta |
| 74656 | EN 50124-1:2017/prA1:2024 | Railway applications - Insulation coordination - Part 1: Basic requirements - Clearances and creepage distances for all electrical and electronic equipment | Aptauja slēgta |
| 81040 | prEN 50463-2:2025 | Railway applications - Energy measurement on board trains - Part 2: Energy measuring | Aptauja slēgta |
Displaying 341-350 of 1130 results.
