CLC/TC 9X
| Registration number (WIID) | Project No. | Title | Status |
|---|---|---|---|
| 53282 | EN 50463-2:2012 | Railway applications - Energy measurement on board trains - Part 2: Energy measuring | Atcelts |
| 44001 | EN 60077-3:2002 | Railway applications - Electric equipment for rolling stock - Part 3: Electrotechnical components - Rules for d.c. circuit-breakers | Atcelts |
| 46204 | CLC/TR 50126-3:2008 | Railway applications - The specification and demonstration of Reliability, Availability, Maintainability and Safety (RAMS) - Part 3: Guide to the application of EN 50126-1 for rolling stock RAM | Atcelts |
| 45063 | EN 50317:2002/A1:2004 | Railway applications - Current collection systems - Requirements for and validation of measurements of the dynamic interaction between pantograph and overhead contact line | Atcelts |
| 54360 | EN 50123-5:1997 | Railway applications - Fixed installations - D.C. switchgear - Part 5: Surge arresters and low-voltage limiters for specific use in d.c. systems | Atcelts |
| 43301 | EN 50121-4:2006 | Railway applications - Electromagnetic compatibility - Part 4: Emission and immunity of the signalling and telecommunications apparatus | Atcelts |
| 53615 | EN 50124-2:2001/corrigendum May 2010 | Railway applications - Insulation coordination - Part 2: Overvoltages and related protection | Atcelts |
| 53381 | EN 50122-2:1998/A1:2002 | Railway applications - Fixed installations - Part 2: Protective provisions against the effects of stray currents caused by d.c. traction systems | Atcelts |
| 42144 | EN 61881:1999 | Railway applications - Rolling stock equipment - Capacitors for power electronics | Atcelts |
| 57177 | EN 50317:2002 | Railway applications - Current collection systems - Requirements for and validation of measurements of the dynamic interaction between pantograph and overhead contact line | Atcelts |
Displaying 361-370 of 1120 results.
