Registration number (WIID)Project No.TitleStatus
53456CLC/TR 50506-2:2009Railway applications - Communication, signalling and processing systems - Application Guide for EN 50129 - Part 2: Safety assuranceAtcelts
42121EN 50152-3-2:2001Railway applications - Fixed installations - Particular requirements for a.c. switchgear - Part 3-2: Measurement, control and protection devices for specific use in a.c. traction systems - Single-phase current transformersAtcelts
55458EN 50152-2:1997Railway applications - Fixed installations - Particular requirements for a.c. switchgear - Part 2: Single-phase disconnectors, earthing switches and switches with Um above 1 kVAtcelts
44738EN 50152-3-1:2003Railway applications - Fixed installations - Particular requirements for a.c. switchgear - Part 3-1: Measurement, control and protection devices for specific use in a.c. traction systems - Application guideAtcelts
57833EN 50152-1:2007Railway applications - Fixed installations - Particular requirements for a.c. switchgear - Part 1: Single-phase circuit-breakers with Un above 1 kVAtcelts
42152EN 50367:2012Railway applications - Current collection systems - Technical criteria for the interaction between pantograph and overhead line (to achieve free access)Atcelts
54448LVS EN 50126-1:2002 /AC:2006Railway applications - The specification and demonstration of reliability, availability, maintainability and safety (RAMS) - Part 1: Basic requirements and generic processAtcelts
42678LVS EN 50123-1:2002Railway applications - Fixed installations - D.C. switchgear - Part 1: GeneralAtcelts
45693HD 591 S1:1993Stationary transformers in traction systemsAtcelts
48372CLC/TR 50506-1:2007Railway applications - Communication, signalling and processing systems - Application Guide for EN 50129 - Part 1: Cross-acceptanceAtcelts
Displaying 441-450 of 1105 results.