Registration number (WIID)Project No.TitleStatus
47201LVS CLC/TS 50546:2013Railway applications - Rolling stock - 3-phase shore (external) supply system for rail vehiclesAtcelts
45968LVS EN 50152-1:2002Railway applications - Fixed installations - Particular requirements for a.c. switchgear - Part 1: Single-phase circuit- breakers with U<(Index)m> above 1 kVAtcelts
57177EN 50317:2002Railway applications - Current collection systems - Requirements for and validation of measurements of the dynamic interaction between pantograph and overhead contact lineAtcelts
46598EN 50126-1:1999Railway applications - The specification and demonstration of Reliability, Availability, Maintainability and Safety (RAMS) - Part 1: Basic requirements and generic processAtcelts
47373LVS CLC/TS 50459-2:2016Railway applications - Communication, signalling and processing systems - European Rail Traffic Management System - Driver-Machine Interface - Part 2: Ergonomic arrangements of GSM-R informationAtcelts
43598LVS EN 50152-2:2008Railway applications - Fixed installations - Particular requirements for a.c. switchgear - Part 2: Single-phase disconnectors, earthing switches and switches with U<(Index)n> above 1 KvAtcelts
49408CLC/TS 50502:2007Railway applications - Rolling stock - Electric equipment in trolley buses - Safety requirements and connection systemsAtcelts
76618LVS EN 50657:2017/A1:2024Railways Applications - Rolling stock applications - Software on Board Rolling StockAtcelts
54469EN 50122-1:1997Railway applications - Fixed installations - Part 1: Protective provisions relating to electrical safety and earthingAtcelts
56900LVS EN 50207:2002Railway applications - Electronic power converters for rolling stockAtcelts
Displaying 461-470 of 1088 results.