CLC/TC 9X
| Registration number (WIID) | Project No. | Title | Status |
|---|---|---|---|
| 56034 | EN 50367:2006/corrigendum May 2010 | Railway applications - Current collection systems - Technical criteria for the interaction between pantograph and overhead line (to achieve free access) | Atcelts |
| 47690 | LVS EN 50123-3:1995/corrigendum Sep. 1996 | Railway applications - Fixed installations - D.C. switchgear - Part 3: Indoor d.c. disconnectors, switch-disconnectors and earthing switches | Atcelts |
| 45605 | LVS EN 50317:2002 /A2:2007 /AC:2010 | Railway applications - Current collection systems - Requirements for and validation of measurements of the dynamic interaction between pantograph and overhead contact line | Atcelts |
| 45063 | LVS EN 50317:2002 /A1:2005 | Railway applications - Current collection systems - Requirements for and validation of measurements of the dynamic interaction between pantograph and overhead contact line | Atcelts |
| 53503 | LVS EN 50163:2002 | Railway applications - Supply voltages of traction systems | Atcelts |
| 48780 | LVS EN 50318:2002 | Railway applications - Current collection systems - Validation of simulation of the dynamic interaction between pantograph and overhead contact line | Atcelts |
| 68088 | LVS EN 50546:2021 | Railway applications - Rolling Stock - Three-phase shore (external) supply system for rail vehicles and its connectors | Atcelts |
| 45968 | LVS EN 50152-1:2002 | Railway applications - Fixed installations - Particular requirements for a.c. switchgear - Part 1: Single-phase circuit- breakers with U<(Index)m> above 1 kV | Atcelts |
| 56900 | LVS EN 50207:2002 | Railway applications - Electronic power converters for rolling stock | Atcelts |
| 45756 | LVS EN 50215:2002 | Railway applications - Testing of rolling stock after completion of construction and before entry into service | Atcelts |
Displaying 461-470 of 1120 results.
