CLC/TC 9X
| Registration number (WIID) | Project No. | Title | Status |
|---|---|---|---|
| 55905 | LVS EN 50123-3:2002 | Railway applications - Fixed installations - D.C. switchgear - Part 3: Indoor d.c. disconnectors and switch-disconnectors | Atcelts |
| 42678 | LVS EN 50123-1:2002 | Railway applications - Fixed installations - D.C. switchgear - Part 1: General | Atcelts |
| 57872 | LVS EN 50123-7-3:2002 | Railway applications - Fixed installations - D.C. switchgear - Part 7: Measurement, control and protection devices for specific use in d.c. traction systems - Section 3: Isolating voltage transducers and other voltage measuring devices | Atcelts |
| 44284 | LVS EN 50123-7-2:2002 | Railway applications - Fixed installations - D.C. switchgear - Part 7: Measurement, control and protection devices for specific use in d.c. traction systems - Section 2: Isolating current transducers and other current measuring devices | Atcelts |
| 45756 | LVS EN 50215:2002 | Railway applications - Testing of rolling stock after completion of construction and before entry into service | Atcelts |
| 56900 | LVS EN 50207:2002 | Railway applications - Electronic power converters for rolling stock | Atcelts |
| 45968 | LVS EN 50152-1:2002 | Railway applications - Fixed installations - Particular requirements for a.c. switchgear - Part 1: Single-phase circuit- breakers with U<(Index)m> above 1 kV | Atcelts |
| 48780 | LVS EN 50318:2002 | Railway applications - Current collection systems - Validation of simulation of the dynamic interaction between pantograph and overhead contact line | Atcelts |
| 45063 | LVS EN 50317:2002 /A1:2005 | Railway applications - Current collection systems - Requirements for and validation of measurements of the dynamic interaction between pantograph and overhead contact line | Atcelts |
| 62982 | LVS CLC/TS 50238-2:2015/AC:2016 | Railway applications - Compatibility between rolling stock and train detection systems - Part 2: Compatibility with track circuits | Atcelts |
Displaying 681-690 of 1120 results.
