CLC/TC 9X
Registration number (WIID) | Project No. | Title | Status |
---|---|---|---|
53838 | EN 60349-2:2001 | Railway applications - Rotating electrical machines for rail and road vehicles - Part 2: Electronic converter-fed alternating current motors | Atcelts |
51722 | CLC/TS 50238-3:2010 | Railway applications - Compatibility between rolling stock and train detection systems - Part 3: Compatibility with axle counters | Atcelts |
51350 | EN 60349-1:2000 | Electric traction - Rotating electrical machines for rail and road vehicles - Part 1: Machines other than electronic convertor-fed alternating current motors | Atcelts |
57464 | EN 50123-2:1995 | Railway applications - Fixed installations - D.C. switchgear - Part 2: D.C. circuit breakers | Atcelts |
52125 | EN 50159-1:2001 | Railway applications - Communication, signalling and processing systems - Part 1: Safety-related communication in closed transmission systems | Atcelts |
52104 | EN 61287-1:2006 | Railway applications - Power convertors installed on board rolling stock - Part 1: Characteristics and test methods | Atcelts |
44013 | EN 50126-1:1999/AC:2012 | Railway applications - The specification and demonstration of Reliability, Availability, Maintainability and Safety (RAMS) - Part 1: Basic requirements and generic process | Atcelts |
62982 | CLC/TS 50238-2:2015/AC:2016-07 | Railway applications - Compatibility between rolling stock and train detection systems - Part 2: Compatibility with track circuits | Atcelts |
44029 | CLC/TS 50459-1:2015 | Railway applications - Communication, signalling and processing systems - European Rail Traffic Management System - Driver-Machine Interface - Part 1: General principles for the presentation of ERTMS/ETCS/GSM-R information | Atcelts |
54137 | EN 50126-1:1999/corrigendum May 2010 | Railway applications - The specification and demonstration of Reliability, Availability, Maintainability and Safety (RAMS) - Part 1: Basic requirements and generic process | Atcelts |
Displaying 721-730 of 1105 results.