CLC/TC 9X
| Registration number (WIID) | Project No. | Title | Status |
|---|---|---|---|
| 52737 | prEN 50XXX | Railway applications - Testing of rolling stock after completion of construction and before entry into service - Requirements for interoperability | Izstrādē |
| 52624 | prEN 50126-4 | Railway applications - Dependability for guided transport systems (availability, reliability, maintenability, safety) - Part 4: Maintenability | Izstrādē |
| 52266 | prHD XXX S1 | Material for overhead contact lines for railways, underground and tramways at rated voltage up to 3 kV - Part 3: Metallic parts of clamps of insulating material | Izstrādē |
| 60933 | EN 50463-5:2017 | Railway applications - Energy measurement on board trains - Part 5: Conformity assessment | Izstrādē |
| 48434 | EN 50553:2012 | Railway applications - Requirements for running capability in case of fire on board of rolling stock | Izstrādē |
| 67862 | prEN IEC 62973-2:2019 | Railway applications - Batteries for auxiliary power supply systems - Part 2: Nickel Cadmium (NiCd) batteries | Izstrādē |
| 56563 | prEN 50XXX | Rolling stock for tramways and metrotramways --General characteristics and performances | Izstrādē |
| 83153 | CLC/prTR 50XXX | Guidelines for the management of data generated by railway systems - Part 1: Rolling Stock | Izstrādē |
| 83152 | prEN 50XXX | Railways Applications - Guidelines for cyber-resilience in railways | Izstrādē |
| 61981 | EN 50121-2:2017 | Railway applications - Electromagnetic compatibility - Part 2: Emission of the whole railway system to the outside world | Izstrādē |
Displaying 901-910 of 1120 results.
