CLC/TC 65X
Registration number (WIID) | Project No. | Title | Status |
---|---|---|---|
44750 | LVS EN 61158-6-14:2012 | Industrial communication networks - Fieldbus specifications - Part 6-14: Application layer protocol specification - Type 14 elements (IEC 61158-6-14:2010) | Atcelts |
46932 | LVS EN 61158-3-21:2012 | Industrial communication networks - Fieldbus specifications - Part 3-21: Data-link layer service definition - Type 21 elements (IEC 61158-3-21:2010) | Atcelts |
43364 | LVS EN 61326-2-3:2013 | Electrical equipment for measurement, control and laboratory use - EMC requirements - Part 2-3: Particular requirements - Test configuration, operational conditions and performance criteria for transducers with integrated or remote signal conditioning (IEC 61326-2-3:2012) | Atcelts |
45881 | LVS EN 61326-1:2013 | Electrical equipment for measurement, control and laboratory use - EMC requirements - Part 1: General requirements (IEC 61326-1:2012) | Atcelts |
49029 | LVS EN 62439-2:2010 | Industrial communication networks - High availability automation networks -- Part 2: Media Redundancy Protocol (MRP) (IEC 62439-2:2010) | Atcelts |
47252 | LVS EN 61069-8:2003 | Industrial-process measurement and control - Evaluation of system properties for the purpose of system assessment - Part 8: Assessment of non-task-related system properties | Atcelts |
42104 | LVS EN 61784-2:2011 | Industrial communication networks - Profiles - Part 2: Additional fieldbus profiles for real-time networks based on ISO/IEC 8802-3 (IEC 61784-2:2010) | Atcelts |
50280 | LVS EN 61158-6-12:2012 | Industrial communication networks - Fieldbus specifications - Part 6-12: Application layer protocol specification - Type 12 elements (IEC 61158-6-12:2010) | Atcelts |
53470 | LVS EN 61784-5-3:2014 | Industrial communication networks - Profiles - Part 5-3: Installation of fieldbuses - Installation profiles for CPF 3 (IEC 61784-5-3:2013) | Atcelts |
43031 | LVS EN 61784-5-6:2014 | Industrial communication networks - Profiles - Part 5-6: Installation of fieldbuses - Installation profiles for CPF 6 (IEC 61784-5-6:2013) | Atcelts |
Displaying 1071-1080 of 1706 results.