CLC/TC 65X
| Registration number (WIID) | Project No. | Title | Status |
|---|---|---|---|
| 81011 | prEN IEC 62337:2025 | Commissioning of electrical, instrumentation and control systems in the process industry - Specific phases and milestones | Aptauja slēgta |
| 79798 | EN IEC 61326-2-6:2025/prAA:2025 | Electrical equipment for measurement, control and laboratory use - EMC requirements - Part 2-6: Particular requirements - In vitro diagnostic (IVD) medical equipment | Aptauja slēgta |
| 76733 | prEN IEC 61508-6:2025 | Functional safety of electrical/electronic/programmable electronic safety-related systems - Part 6: Guidelines on the application of IEC 61508-2 and IEC 61508-3 (see Functional Safety and IEC 61508) | Aptauja slēgta |
| 76732 | prEN IEC 61508-7:2025 | Functional safety of electrical/electronic/programmable electronic safety-related systems - Part 7: Overview of techniques and measures | Aptauja slēgta |
| 76736 | prEN IEC 61508-3:2025 | Functional safety of electrical/electronic/programmable electronic safety-related systems - Part 3: Software requirements | Aptauja slēgta |
| 75926 | prEN IEC 62264-4:2025 | Enterprise-control system integration - Part 4: Objects models attributes for manufacturing operations management integration | Aptauja slēgta |
| 49630 | EN 61131-2:2007 | Programmable controllers - Part 2: Equipment requirements and tests | Standarts spēkā |
| 67640 | EN IEC 62541-4:2020 | OPC Unified Architecture - Part 4: Services | Standarts spēkā |
| 68568 | LVS EN IEC 61326-2-4:2021 | Electrical equipment for measurement, control and laboratory use - EMC requirements - Part 2-4: Particular requirements - Test configurations, operational conditions and performance criteria for insulation monitoring devices according to IEC 61557-8 and for equipment for insulation fault location according to IEC 61557-9 | Standarts spēkā |
| 67652 | EN IEC 62541-7:2020 | OPC unified architecture - Part 7: Profiles | Standarts spēkā |
Displaying 1141-1150 of 1769 results.
