CLC/TC 65X
Registration number (WIID) | Project No. | Title | Status |
---|---|---|---|
74735 | prEN IEC 62453-1:2022 | Field device tool (FDT) interface specification - Part 1: Overview and guidance | Aptauja slēgta |
77438 | prEN IEC 62541-4:2024 | OPC unified architecture - Part 4: Services | Aptauja slēgta |
74528 | prEN IEC 61514-2:2024 | Industrial process control systems - Part 2: Methods of evaluating the performance of intelligent valve positioners with pneumatic outputs mounted on an actuator valve assembly | Aptauja slēgta |
78086 | prEN IEC 62541-2:2024 | OPC unified architecture - Part 2: Security model | Aptauja slēgta |
78079 | prEN IEC 62541-22:2024 | OPC unified architecture - Part 22: Base network model | Aptauja slēgta |
78672 | prEN IEC 61298-1:2024 | Process measurement and control devices - General methods and procedures for evaluating performance - Part 1: General considerations | Aptauja slēgta |
77442 | prEN IEC 62541-100:2024 | OPC unified architecture - Part 100: Device interface | Aptauja slēgta |
78670 | prEN IEC 61298-3:2024 | Process measurement and control devices - General methods and procedures for evaluating performance - Part 3: Tests for the effects of influence quantities | Aptauja slēgta |
75662 | EN IEC 61326-1:2021/prAA:2023 | Electrical equipment for measurement, control and laboratory use - EMC requirements - Part 1: General requirements | Aptauja slēgta |
78077 | prEN IEC 62541-24:2024 | OPC unified architecture - Part 24: Scheduler | Aptauja slēgta |
Displaying 1171-1180 of 1706 results.