CLC/TC 65X
Registration number (WIID) | Project No. | Title | Status |
---|---|---|---|
51854 | LVS EN 62337:2012 | Commissioning of electrical, instrumentation and control systems in the process industry - Specific phases and milestones (IEC 62337:2012) | Standarts spēkā |
51930 | LVS EN 62339-1:2007 | Modular component interfaces for surface-mount fluid distribution components - Part 1: Elastomeric seals | Standarts spēkā |
46952 | LVS EN 62381:2007 | Automation systems in the process industry - Factory acceptance test (FAT), site acceptance test (SAT), and site integration test (SIT) | Atcelts |
45213 | LVS EN 62381:2012 | Automation systems in the process industry - Factory acceptance test (FAT), site acceptance test (SAT), and site integration test (SIT) IEC 62381:2012) | Atcelts |
51847 | LVS EN 62382:2007 | Electrical and instrumentation loop check | Atcelts |
56969 | LVS EN 62382:2013 | Control systems in the process industry - Electrical and instrumentation loop check (IEC 62382:2012) | Atcelts |
52360 | LVS EN 62419:2009 | Control technology - Rules for the designation of measuring instruments (IEC 62419:2008) | Standarts spēkā |
55624 | LVS EN 62424:2010 | Representation of process control engineering - Requests in P&I diagrams and data exchange between P&ID tools and PCE-CAE tools (IEC 62424:2008) | Atcelts |
55426 | LVS EN 62424:2017 | Representation of process control engineering - Requests in P&I diagrams and data exchange between P&ID tools and PCE-CAE tools | Standarts spēkā |
54575 | LVS EN 62439-1:2010 | Industrial communication networks - High availability automation networks - Part 1: General concepts and calculation methods (IEC 62439-1:2010) | Standarts spēkā |
Displaying 1241-1250 of 1706 results.