CLC/TC 65X
| Registration number (WIID) | Project No. | Title | Status |
|---|---|---|---|
| 45213 | EN 62381:2012 | Automation systems in the process industry - Factory acceptance test (FAT), site acceptance test (SAT) and site integration test (SIT) | Standarts spēkā |
| 77434 | EN IEC 62541-8:2026 | OPC unified architecture - Part 8: Data access | Standarts spēkā |
| 77436 | LVS EN IEC 62541-6:2026 | OPC unified architecture - Part 6: Mappings | Standarts spēkā |
| 68439 | EN IEC 61784-5-12:2018 | Industrial communication networks - Profiles - Part 5-12: Installation of fieldbuses - Installation profiles for CPF 12 | Standarts spēkā |
| 52771 | EN 60746-3:2002 | Expression of performance of electrochemical analyzers - Part 3: Electrolytic conductivity | Standarts spēkā |
| 78078 | EN IEC 62541-23:2026 | OPC unified architecture - Part 23: Common ReferenceTypes | Standarts spēkā |
| 53379 | EN 60534-9:2007 | Industrial-process control valves - Part 9: Test procedure for response measurements from step inputs | Standarts spēkā |
| 73380 | LVS EN IEC 62453-2:2023 | Field device tool (FDT) interface specification - Part 2: Concepts and detailed description | Standarts spēkā |
| 72948 | LVS EN IEC 63278-1:2024 | Asset Administration Shell for industrial applications - Part 1: Asset Administration Shell structure | Standarts spēkā |
| 76058 | LVS EN IEC 61918:2019/A2:2024 | Industrial communication networks - Installation of communication networks in industrial premises | Standarts spēkā |
Displaying 1331-1340 of 1779 results.
