CLC/TC 65X
| Registration number (WIID) | Project No. | Title | Status |
|---|---|---|---|
| 67645 | EN IEC 62541-5:2020 | OPC Unified Architecture - Part 5: Information Model | Izstrādē |
| 68568 | EN IEC 61326-2-4:2021 | Electrical equipment for measurement, control and laboratory use - EMC requirements - Part 2-4: Particular requirements - Test configurations, operational conditions and performance criteria for insulation monitoring devices according to IEC 61557-8 and for equipment for insulation fault location according to IEC 61557-9 | Izstrādē |
| 66250 | prEN 63082-1 | Intelligent device management - Part 1: Concepts and terminology | Izstrādē |
| 66578 | CLC/TR 62453-51-32:2019 | Field device tool (FDT) interface specification - Part 51-32: Communication implementation for common object model - IEC 61784 CP 3/4, CP 3/5 and CP 3/6 | Izstrādē |
| 60754 | EN 62952-1:2016 | Power sources for a wireless communication device - Part 1: General requirements of power modules | Izstrādē |
| 61942 | EN 61326-3-1:2017 | Electrical equipment for measurement, control and laboratory use - EMC requirements - Part 3-1: Immunity requirements for safety-related systems and for equipment intended to perform safety-related functions (functional safety) - General industrial applications | Izstrādē |
| 54087 | prEN 61158-4 | Digital data communications for measurement and control - Fieldbus for use in industrial control systems - Part 4: Data Link protocol specification | Izstrādē |
| 49261 | EN 61158-6-17:2008 | Industrial communication networks - Fieldbus specifications - Part 6-17: Application layer protocol specification - Type 17 elements | Izstrādē |
| 75327 | EN IEC 62769-6-200:2023 | Field Device Integration (FDI®) - Part 6-200: Technology Mapping - HTML5 | Izstrādē |
| 60550 | EN 62264-5:2016 | Enterprise-control system integration - Part 5: Business to manufacturing transactions | Izstrādē |
Displaying 1481-1490 of 1734 results.
