CLC/TC 65X
| Registration number (WIID) | Project No. | Title | Status |
|---|---|---|---|
| 69740 | EN IEC 62439-2:2022 | Industrial communication networks - High availability automation networks - Part 2: Media Redundancy Protocol (MRP) | Standarts spēkā |
| 75312 | EN IEC 61406-1:2022 | Identification Link - Part 1: General requirements | Standarts spēkā |
| 69282 | EN IEC 62439-3:2022 | Industrial communication networks - High availability automation networks - Part 3: Parallel Redundancy Protocol (PRP) and High-availability Seamless Redundancy (HSR) | Standarts spēkā |
| 71555 | EN IEC 62714-2:2022 | Engineering data exchange format for use in industrial automation systems engineering - Automation markup language - Part 2: Semantics libraries | Standarts spēkā |
| 68569 | LVS EN IEC 61326-2-1:2021 | Electrical equipment for measurement, control and laboratory use - EMC requirements - Part 2-1: Particular requirements - Test configurations, operational conditions and performance criteria for sensitive test and measurement equipment for EMC unprotected applications | Standarts spēkā |
| 72096 | EN IEC 62714-5:2022 | Engineering data exchange format for use in industrial automation systems engineering - Automation markup language - Part 5: Communication | Standarts spēkā |
| 66241 | LVS EN IEC 62832-2:2021 | Industrial-process measurement, control and automation - Digital factory framework - Part 2: Model elements | Standarts spēkā |
| 70784 | LVS EN IEC 62832-1:2021 | Industrial-process measurement, control and automation - Digital factory framework - Part 1: General principles | Standarts spēkā |
| 67655 | LVS EN IEC 62541-9:2020 | OPC Unified Architecture - Part 9: Alarms and Conditions | Standarts spēkā |
| 54897 | LVS EN 61784-5-1:2014 | Industrial communication networks - Profiles - Part 5-1: Installation of fieldbuses - Installation profiles for CPF 1 (IEC 61784-5-1:2013) | Standarts spēkā |
Displaying 1711-1720 of 1727 results.
