CLC/TC 65X
| Registration number (WIID) | Project No. | Title | Status |
|---|---|---|---|
| 68438 | EN IEC 61784-5-8:2018 | Industrial communication networks - Profiles - Part 5-8: Installation of fieldbuses - Installation profiles for CPF 8 | Standarts spēkā |
| 57920 | EN 61514-2:2013 | Industrial process control systems - Part 2: Methods of evaluating the performance of intelligent valve positioners with pneumatic outputs mounted on an actuator valve assembly | Standarts spēkā |
| 69747 | LVS EN IEC 62881:2019/AC:2019 | Cause and Effect Matrix | Standarts spēkā |
| 62439 | EN 62952-3:2017 | Power sources for a wireless communication device - Part 3: Generic energy harvesting adaptor module | Standarts spēkā |
| 71581 | LVS CLC IEC/TR 61511-4:2020 | Functional safety - Safety instrumented systems for the process industry sector - Part 4: Explanation and rationale for changes in IEC 61511-1 from Edition 1 to Edition 2 | Standarts spēkā |
| 73032 | LVS EN IEC 62714-4:2020/AC:2021 | Engineering data exchange format for use in industrial automation systems engineering - Automation markup language - Part 4: Logic | Standarts spēkā |
| 73032 | EN IEC 62714-4:2020/AC:2020-12 | Engineering data exchange format for use in industrial automation systems engineering - Automation markup language - Part 4: Logic | Standarts spēkā |
| 49630 | EN 61131-2:2007 | Programmable controllers - Part 2: Equipment requirements and tests | Standarts spēkā |
| 67640 | EN IEC 62541-4:2020 | OPC Unified Architecture - Part 4: Services | Standarts spēkā |
| 68568 | LVS EN IEC 61326-2-4:2021 | Electrical equipment for measurement, control and laboratory use - EMC requirements - Part 2-4: Particular requirements - Test configurations, operational conditions and performance criteria for insulation monitoring devices according to IEC 61557-8 and for equipment for insulation fault location according to IEC 61557-9 | Standarts spēkā |
Displaying 1721-1730 of 1774 results.
