CLC/TC 65X
Registration number (WIID) | Project No. | Title | Status |
---|---|---|---|
72639 | LVS EN IEC 61784-5-22:2024 | Industrial networks - Profiles - Part 5-22: Installation of fieldbuses - Installation profiles for CPF 22 | Standarts spēkā |
72636 | EN IEC 61784-5-8:2024 | Industrial networks - Profiles - Part 5-8: Installation of fieldbuses - Installation profiles for CPF 8 | Standarts spēkā |
72636 | LVS EN IEC 61784-5-8:2024 | Industrial networks - Profiles - Part 5-8: Installation of fieldbuses - Installation profiles for CPF 8 | Standarts spēkā |
72469 | FprEN IEC 61010-2-203:2024 | Safety requirements for electrical equipment for measurement, control and laboratory use - Part 2-203: Particular requirements for industrial communication circuits and communication port interconnection | Izstrādē |
72277 | EN IEC 62264-6:2022 | Enterprise-control system integration - Part 6: Messaging service model | Izstrādē |
72277 | LVS EN IEC 62264-6:2022 | Enterprise-control system integration - Part 6: Messaging service model | Standarts spēkā |
72141 | EN IEC 61158-2:2023 | Industrial communication networks - Fieldbus specifications - Part 2: Physical layer specification and service definition | Izstrādē |
72141 | LVS EN IEC 61158-2:2023 | Industrial communication networks - Fieldbus specifications - Part 2: Physical layer specification and service definition | Standarts spēkā |
72137 | EN IEC 61784-2-21:2023 | Industrial networks - Profiles - Part 2-21: Additional real-time fieldbus profiles based on ISO/IEC/IEEE 8802-3 - CPF 21 | Izstrādē |
72137 | LVS EN IEC 61784-2-21:2023 | Industrial networks - Profiles - Part 2-21: Additional real-time fieldbus profiles based on ISO/IEC/IEEE 8802-3 - CPF 21 | Standarts spēkā |
Displaying 331-340 of 1706 results.