CLC/TC 65X
| Registration number (WIID) | Project No. | Title | Status |
|---|---|---|---|
| 48969 | LVS EN 50325-1:2002 | Industrial communications subsystem based on ISO 11898 (CAN) for controller-device interfaces - Part 1: General requirements | Atcelts |
| 42847 | EN 62541-8:2015 | OPC Unified Architecture - Part 8: Data Access | Atcelts |
| 50369 | LVS EN 61158-6-18:2008 | Industrial communication networks - Fieldbus specifications - Part 6-18: Application layer protocol specification - Type 18 elements | Atcelts |
| 55167 | LVS EN 61784-5-3:2008 | Industrial communication networks - Profiles - Part 5-3: Installation of fieldbuses - Installation profiles for CPF 3 (IEC 61784-5-3:2007) | Atcelts |
| 47522 | LVS EN 61158-2:2004 | Digital data communication for measurement and control - Fieldbus for use in industrial control systems - Part 2: Physical layer specification | Atcelts |
| 48024 | LVS EN 62264-2:2008 | Enterprise-control system integration - Part 2: Object model attributes | Atcelts |
| 46457 | EN 61131-3:2003 | Programmable controllers - Part 3: Programming languages | Atcelts |
| 66054 | EN IEC 62439-3:2018 | Industrial communication networks - High availability automation networks - Part 3: Parallel Redundancy Protocol (PRP) and High-availability Seamless Redundancy (HSR) | Atcelts |
| 52432 | LVS EN 61326-2-6:2013 | Electrical equipment for measurement, control and laboratory use - EMC requirements - Part 2-6: Particular requirements - In vitro diagnostic (IVD) medical equipment (IEC 61326-2-6:2013) | Atcelts |
| 51625 | LVS EN 61326-2-4:2013 | Electrical equipment for measurement, control and laboratory use - EMC requirements - Part 2-4: Particular requirements - Test configurations, operational conditions and performance criteria for insulation monitoring devices according to IEC 61557-8 and for equipment for insulation fault location according to IEC 61557-9 (IEC 61326-2-4:2012) | Atcelts |
Displaying 681-690 of 1769 results.
