CLC/TC 22X
Registration number (WIID) | Project No. | Title | Status |
---|---|---|---|
53220 | EN 50091-1-2:1998/corrigendum Aug. 1999 | Uninterruptible power systems (UPS) - Part 1-2: General and safety requirements for UPS used in restricted access locations | Atcelts |
51197 | EN 50091-1-2:1998 | Uninterruptible power systems (UPS) - Part 1-2: General and safety requirements for UPS used in restricted access locations | Atcelts |
44120 | EN 50091-1:1993/corrigendum Jun. 1993 | Uninterruptible power systems (UPS) - Part 1: General and safety requirements | Atcelts |
54315 | EN 50091-1:1993 | Uninterruptible power systems (UPS) - Part 1: General and safety requirements | Atcelts |
42002 | EN 50091-1-1:1996/prA1 | Uninterruptible power systems (UPS) - Part 1-1: General and safety requirements for UPS used in operator access areas | Izstrādē |
49687 | EN 50091-1-1:1996/corrigendum Aug. 2004 | Uninterruptible power systems (UPS) - Part 1-1: General and safety requirements for UPS used in operator access areas | Atcelts |
46717 | EN 50091-1-1:1996 | Uninterruptible power systems (UPS) - Part 1-1: General and safety requirements for UPS used in operator access areas | Atcelts |
42829 | CLC/TR 61800-6:2007 | Adjustable speed electrical power drive systems - Part 6: Guide for determination of types of load duty and corresponding current ratings | Izstrādē |
46776 | CLC/TR 61491:2010 | Electrical equipment of industrial machines - Serial data link for real-time communication between controls and drives | Atcelts |
60947 | CLC/TR 60919-2:2010/prA1 | Performance of high-voltage direct current (HVDC) systems with line-commutated converters - Part 2: Faults and switching | Izstrādē |
Displaying 361-370 of 372 results.