CLC/TC 79
Registration number (WIID) | Project No. | Title | Status |
---|---|---|---|
51064 | LVS EN 50518-1:2014 | Monitoring and alarm receiving centre - Part 1: Location and construction requirements | Atcelts |
51064 | EN 50518-1:2013 | Monitoring and alarm receiving centre - Part 1: Location and construction requirements | Atcelts |
51042 | EN 50136-2-4:1998 | Alarm systems - Alarm transmission systems and equipment - Part 2-4: Requirements for equipment used in systems with voice communicators using the public switched telephone network | Atcelts |
51042 | LVS EN 50136-2-4:2002 | Alarm systems - Alarm transmission systems and equipment - Part 2-4: Requirements for equipment used in systems with voice communicators using the public switched telephone network | Atcelts |
50996 | LVS EN 50131-2-6:2009 /IS1:2014 | Alarm systems - Intrusion and hold-up systems - Part 2-6: Opening contacts (magnetic) | Standarts spēkā |
50996 | EN 50131-2-6:2008/IS1:2014 | Alarm systems - Intrusion and hold-up systems - Part 2-6: Opening contacts (magnetic) | Izstrādē |
50896 | EN 50131-5-3:2005 | Alarm systems - Intrusion systems - Part 5-3: Requirements for interconnections equipment using radio frequency techniques | Atcelts |
50896 | LVS EN 50131-5-3:2005 | Alarm systems - Intrusion systems - Part 5-3: Requirements for interconnections equipment using radio frequency techniques | Atcelts |
50747 | CLC/prTS 50131-2-Y | Alarm systems - Intrusion and hold-up systems - Part 2-Y: Bolt contacts - Requirements for bolt contacts monitoring the lock status of doors | Izstrādē |
50591 | LVS EN 50131-6:2008 | Alarm systems - Intrusion and hold-up systems - Part 6: Power supplies | Atcelts |
Displaying 321-330 of 544 results.