Registration number (WIID)Project No.TitleStatus
84959ISO/PWI 17538GHG emissions during natural gas production and transport to LNG plantIzstrādē
85553ISO/PWI 20257-3Installation and equipment for liquefied natural gas — Design of offshore installations — Part 3: Specific FLNG issuesIzstrādē
70235ISO/PWI 20257-3Installation and equipment for liquefied natural gas — Design of offshore installations — Part 3: Specific requirements for FLNGIzstrādē
71918ISO/NP 21834LNG bunkering connectorIzstrādē
87027ISO/WD 22238Design, construction and testing of high-pressure gas transfer systemsIzstrādē
87323ISO/PWI 22865LNG tank container intermodal transportation and utilizationIzstrādē
88089ISO/DIS 6338-4Calculations of greenhouse gas (GHG) emissions throughout the liquefied natural gas (LNG) chain — Part 4: ShippingIzstrādē
88090ISO/DIS 6338-5Calculations of greenhouse gas (GHG) emissions throughout the liquefied natural gas (LNG) chain — Part 5: RegasificationIzstrādē
70234ISO/AWI 20257-2Installation and equipment for liquefied natural gas — Design of offshore installations — Part 2: Specific requirements for FSRUIzstrādē
80992ISO/PWI 5203High pressure transfer of compressed gasIzstrādē
Displaying 11-20 of 21 results.