Registration number (WIID)Project No.TitleStatus
82670prEN 16907-4 revEarthworks - Part 4: Soil treatment with lime and/or hydraulic bindersIzstrādē
82669prCEN/TS 17006 revEarthworks - Continuous Compaction Control (CCC)Izstrādē
70927CEN/TS 17693-2:2021Earthworks - Soil treatment tests - Part 2: Test of evaluation of the aptitude of a dry material to emit dustIzstrādē
70926CEN/TS 17693-1:2021Earthworks - Soil treatment tests - Part 1: pH-test for determination of the lime requirement of soils for stabilization (Lime Fixation Point LFP, Lime Modification Optimum LMO)Izstrādē
83061prCEN/TS 17693-1 revEarthworks - Soil treatment tests - Part 1: pH-test for determination of the lime requirement of soils for stabilization (Lime Fixation Point LFP, Lime Modification Optimum LMO)Izstrādē
80062FprCEN/TS 17685-4Earthworks - Chemical tests - Part 4: Determination of soluble sulphate (in water) content in soilsIzstrādē
70925EN 17685-1:2023Earthworks - Chemical tests - Part 1: Determination of organic matter content by loss on ignitionIzstrādē
75542FprEN 17542-5Earthworks - Geotechnical laboratory tests - Part 5: Test method for measurement of one-dimensional swelling of soils under oedometric conditionIzstrādē
71425EN 17542-3:2022Earthworks - Geotechnical laboratory tests - Part 3: Methylene blue value VBS on soils and rocksIzstrādē
80064-prCEN/TS 17685-3 "Earthworks — Chemical tests — Part 3: Determination of carbonate content in soils"Izstrādē
Displaying 11-20 of 46 results.