CEN/TC 396
| Registration number (WIID) | Project No. | Title | Status |
|---|---|---|---|
| 59907 | - | Earthworks - Test procedures | Izstrādē |
| 64531 | - | Earthworks - Use of secondary manufactured and recycled materials in Earthworks | Izstrādē |
| 75529 | - | Earthworks - Part 9: Sustainable earthworks (CEN/TR 16907-9) | Izstrādē |
| 75542 | FprEN 17542-5 | Earthworks - Geotechnical laboratory tests - Part 5: Test method for measurement of one-dimensional swelling of soils under oedometric condition | Izstrādē |
| 75541 | FprEN 17542-4 | Earthworks - Geotechnical laboratory tests - Part 4: Test method for measurement of collapse potential of soils | Izstrādē |
| 80061 | FprCEN/TS 17685-5 | Earthworks - Chemical tests - Part 5: Determination of water-soluble salts content in soils by gravimetric method | Izstrādē |
| 82670 | prEN 16907-4 rev | Earthworks - Part 4: Soil treatment with lime and/or hydraulic binders | Izstrādē |
| 82669 | prCEN/TS 17006 rev | Earthworks - Continuous Compaction Control (CCC) | Izstrādē |
| 70927 | CEN/TS 17693-2:2021 | Earthworks - Soil treatment tests - Part 2: Test of evaluation of the aptitude of a dry material to emit dust | Izstrādē |
| 70926 | CEN/TS 17693-1:2021 | Earthworks - Soil treatment tests - Part 1: pH-test for determination of the lime requirement of soils for stabilization (Lime Fixation Point LFP, Lime Modification Optimum LMO) | Izstrādē |
Displaying 31-40 of 46 results.