CEN/TC 107
| Registration number (WIID) | Project No. | Title | Status |
|---|---|---|---|
| 58428 | EN 15632-4:2022 | District heating pipes - Factory made flexible pipe systems - Part 4: Bonded system with metal service pipes; requirements and test methods | Izstrādē |
| 58429 | prEN 488 rev | District heating pipes - Preinsulated bonded pipe systems for directly buried hot water networks - Steel valve assembly for steel service pipes, polyurethane thermal insulation and outer casing of polyethylene | Izstrādē |
| 34076 | EN 13941:2009/FprA1 | Design and installation of preinsulated bonded pipe systems for district heating | Izstrādē |
| 65152 | prEN 489 rev | District heating pipes - Preinsulated bonded pipe systems for directly buried hot water networks - Joint assembly for steel service pipes, polyurethane thermal insulation and outer casing of polyethylene | Izstrādē |
| 36803 | EN 253:2009/FprA1 | District heating pipes - Preinsulated bonded pipe systems for directly buried hot water networks - Pipe assembly of steel service pipe, polyurethane thermal insulation and outer casing of polyethylene | Izstrādē |
| 39224 | EN 253:2009+A1:2013/FprA2 | District heating pipes - Preinsulated bonded pipe systems for directly buried hot water networks - Pipe assembly of steel service pipe, polyurethane thermal insulation and outer casing of polyethylene | Izstrādē |
| 39223 | EN 15632-1:2009/FprA1 | District heating pipes - Pre-insulated flexible pipe systems - Part 1: Classification, general requirements and test methods | Izstrādē |
| 39227 | EN 15632-3:2010/FprA1 | District heating pipes - Pre-insulated flexible pipe systems - Part 3: Non bonded system with plastic service pipes - Requirements and test methods | Izstrādē |
| 73331 | prEN 18213-1 | District heating and district cooling pipes - Bonded single and twin pipe systems for directly buried hot and cold water networks - Part 1: Qualification testing of fitter | Izstrādē |
| 73333 | prEN 18213-2 | District heating and district cooling pipes - Bonded single and twin pipe systems for directly buried hot and cold water networks - Part 2: Qualification testing of PE-Welder | Izstrādē |
Displaying 151-160 of 165 results.
